Facebook E-mail

Past projects...


Ringstation II, Anderlecht


Office building renovations

Nadiluxe gave the office buildings at the former Philips site in Anderlecht a whole new lease of life, both inside and out. Over 14,000 m2 of raised floors and lowered ceilings were installed in order to create comfortable and flexible office spaces. Following the extensive renovation of the two existing buildings, the client opted for an additional attic conversion and the installation of a lift. A fine example of modern design in a historical context.

 

       
       
       


back